Sunil
There are two methods for assigning a BOM to an equipment master:
- Indirect allocation via an Equipment BOM (IB01). With this option there is a 1:1 relationship between the BOM and equipment.
- Direct allocation via the construction type within the equipment master. In this option there is a n:1 relationship between the BOM and equipment i.e. a single BOM can be allocated to multiple equipment
PeteA