Quantcast
Viewing all articles
Browse latest Browse all 8695

Changing existing classical scenarios in ID to ICo post PI upgrade

Dear Members,

 

Installed a test PI 7.11 system and restored primary PI DEV system backup on to the test PI system and then the test PI 7.11 system was upgraded to PO 7.4 dual stack system. Done with the post up-gradation activities and the test PO 7.4 system was up and running.

 

Now, all the ID config objects in the upgraded test PO 7.4 system remained as classical scenarios with sender agreement, receiver determination, interface determination & receiver agreement etc.,

 

Need a clarification here i.e., how to change the existing classical scenarios to ICo objects in the upgraded PO 7.4 test system..? Do we need to delete the existing sender agreement, receiver determination, interface determination, receiver agreement objects and manually build ICo objects for the respective scenarios (or) do we have any other alternative.


I suppose that the Content Migration Tool doesn't suffice my requirement, as the new PO 7.4 system is not a parallel system built against the existing

PI 7.11 system. I directly performed the upgrade activity on the test system and not on a parallel built system.

 

In this case, can someone advice how to change the existing classical scenarios to ICo objects i.e., manually (or) do we have any other alternative.

 

 

Br,

Saiganesh


Viewing all articles
Browse latest Browse all 8695

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>