Hi, Mukthar,
thanx, it seems working that way for the normal material ( so question 1 is answered ).
1. i have an addtional question for this situation, if i have material stocked in plant, would that cause some inconsistency ?
2.
but for the material with 119000 as cost estimation , it does not work
question 2. : after calliing CKR1 for this mat. if got every thing to 0
Image may be NSFW.
Clik here to view.
but if i call CK11n for cost est. the 119000 is still there, and new added 200 is missing.
do u have a solution for that.?
Thanks!