Yes it is, but when they want to canceled PO (Inbound/Outbound Delivery - 8000017396) after UD in VL09 they have message: "Deficit of BA Stck.in qual.insp 1 000 KG: 10000110 2100 S020 GP20121231", "Message no. M7021". Reversing UD and returning the QI is not possible on same inspection lot. I can reverse UD on inspection lot 89 but however I cannot cancel PO (Inbound/Outbound Delivery - 8000017396).
We made UD but after that we saw that something is not alright so we want to cancelled
All other nonQM transaction give msg “Change the inspection stock of material 10000110 in QM only“ what is not possible in SAP.
I put movement type 656 for transaction mb1a and mb11 but nothing … msg “Update control of movement type is incorrect (entry 656 X X)“
Do I need to check mark somewhere in QM?