I Ran your Code and get
The value 12/09/1985 is not a valid date. It does not correspond to the XML format for ABAP.
ABAP uses ISO 8601 See http://en.wikipedia.org/wiki/ISO_8601
Date needs to be in the correct format
I Ran your Code and get
The value 12/09/1985 is not a valid date. It does not correspond to the XML format for ABAP.
ABAP uses ISO 8601 See http://en.wikipedia.org/wiki/ISO_8601
Date needs to be in the correct format